Carseland Cogeneration Plant
Overview
Since 2001, Carseland已经从其位于Carseland的工业热电联产工厂向Alberta提供了高达95兆瓦的电力, Alta., at Nutrien’s Carseland Nitrogen Operation. 除了为Nutrien提供稳定的动力和蒸汽来源, 该电厂为阿尔伯塔省南部电网提供了急需的支持,为阿尔伯塔省的家庭和企业提供了稳定的电力来源.
FAQs
What is a cogeneration plant?
热电联产是从一种燃料源同时生产两种形式的有用能源, often electricity and steam from natural gas. 热电联产工厂最大限度地减少燃料消耗,节省资金,并能大大减少排放.
How much power does the Carseland Plant produce?
Carseland工厂的发电能力为95兆瓦,每小时还能产生120吨蒸汽, which is captured and delivered to Nutrien for its operations. The plant is designed to operate at full load, 24 hours per day, year-round (except during periods of routine maintenance).
What kind of fuel does the Carseland Plant use?
Carseland在燃烧涡轮机中使用清洁燃烧的天然气来发电. 该工厂采用干式低诺克斯燃烧技术,燃油效率高,可最大限度地减少排放.
Documents and maps
TC能源公司的Carseland热电联产厂实现了双重目的——为工厂供电,并帮助稳定阿尔伯塔省家庭的电网——这一切都要归功于天然气.
Carseland热电厂是我们在阿尔伯塔省的发电厂网络的一部分. Here’s where you can find us.
How are we regulated?
TC能源公司在艾伯塔省的发电厂和业务是按照加拿大联邦政府制定的法规进行管理的 Alberta Utilities Commission (AUC).
Alberta Utilities Commission (AUC) | ||
---|---|---|
Calgary 403-592-8845 |
Ways to reach us
If you have any questions about the Project, please reach out to us via the contact information below.
Carseland Cogeneration Plant (TC Energy) | ||
---|---|---|
Carseland Cogeneration Plant (TC Energy)
|
Jamie Draper |
Emergency Response | |
---|---|
我们对人民、管道和设施安全的承诺是坚定不移的,请访问我们的 Contact page for our complete list of emergency numbers. |
Media Relations | |
---|---|
TC Energy welcomes enquiries from media. Please direct questions to: | |
1-800-608-7859 Toll-free (North America) | media@fuxipla.com |
Investor Relations | |
---|---|
欢迎分析师、股东及准股东查询: | |
1-800-361-6522 Toll-free (North America) | investor_relations@fuxipla.com |
Overview |
我们的WB2VA管道项目是我们继续致力于提高管道完整性和保护环境的一部分. As part of the project, we’ll be upgrading inspection technology, replacing a river crossing, mainline valves and more. This important line runs from Hardy County, W.Va., to Green County, Va..